Wind and Utility Projects
Project Management, Engineering, and Commissioning Management of Wind Energy and Electric Utility infrastructure.
Delivered on time and on budget safely.

BC Wind
Meikle Wind, Tumbler Ridge
Energization and Commissioning Director.
-
Balance of Plant (BOP) commissioning
-
230 kV Substation commissioning
-
Overall responsibility for the Site Energized environment
-
Constructed and managed the LOTO system
-
BC Hydro Interconnection requirements and conformance tests
-
Engineering completions and As-built hand-over to Owner
-
COD compliance and Completion
BC Wind
Cape Scott Wind, Port Hardy
Energization and Commissioning Director.
-
Balance of Plant (BOP) commissioning
-
230 kV Substation commissioning
-
Overall responsibility for the Site Energized environment
-
Constructed and managed the LOTO system
-
BC Hydro Interconnection requirements and conformance tests
-
Engineering completions and As-built hand-over to Owner
-
COD compliance and Completion


Ontario Wind
K2 Wind
Commissioning Manager
-
275 MW, 145 WTG, 500 kV and 230 kV substations
-
Hydro One 500 kV Bruce Special Protections interconnection with 800 kV primary switching equipment
-
Led Commissioning and Engineering Completions
-
Primary Hydro One and IESO compliance
-
DFR and compliance testing COD
BC Electric Utilities
Transmission Substations
Program Manager: $100M rolling annual budget
Engineering Manager: Design, specification and procurement
Commissioning Manager: Commissioning and Completions
Telecommunications: Led utility fibre optic, SONET, ATM, and utility SCADA substation automation design and construction.